Submarine cable in Baku (AZ)
Facts
Status
Completed
When?
Aug-Nov 2012
Where?
Baku Oily Rocks
This project consisted of the following elements:
- To prepare drawings for the cable cage to Baltiskiy 106 vessel.
- To manufacture the cable cage and transport it to the vessel and install it.
- To plan the loading of the marine cable with mobile crane and barges.
- To transport the cable loading equipment by sea to the loadinplace.
- To pilot the vessel and moor it offshore at the cable loading site at Båtviken in Kantvik
- To load the 21 km long marine 35kV cable into the vessel at Prysmiann premises.
- To prepare drawings for the cable arch to enable the transfer of the cable from Baltiskiy 106 to the cable loading barge.
- To travel to Baku in Azerbaijan and supervise the discharging of the cable form Baltiskiy 106 to the cable laying barge.
- To supervise the installation of the cable laying machinery on the cable laying barge in Baku
- To supervise the cable laying for Prysmian and Nobel Oil account on the Oil Rocks oil field.